Sunday, March 1, 2009

AirBrush Lesson 1 - Control.. Control.. Control..

Today the whole gang of us went back to office for the Load Test exercise.. Reached office @ 9am(This is much earlier than my church service time) and most of my colleagues are already there.. Anyway suppose to do a switch to the temp power source and sway sway.. tried to switch 3 times and all 3 times the circuit breaker trips. Anyway I suppose its God blessing in a way too, better to trip now then to trip later when all of us are 'working' in the office later right? ha..
Anyway decided to make do with the temp power and hope that our UPS can really tahan the short 5 mins power switch else its a whole lot of work that we gotta do..

God Bless. Everything went on pretty smoothly and to sum it out.. We reached office at 9am, did almost 30 mins of work and its standby in the office all the way till 4pm..

The idling duration may seem boring to some.. but luckily those who came today were those who totally click and thus there was damn lotsa crap talking today..

And the highlight of the day was, AIRBRUSH! Yup, in fact, to prepare for this long day, almost each of us bought a Gundam and got our very very nice chief engineer to cut,sandpaper and model it for us(Thank you, Miss Chee!!). So Peter went thru with us the basic of airbrushing and there we go, we begin to airbrush our own coloured version of Gundam.. Think mine looks kinda crappy due to my shaky hands and lack of control.. Ha.. But once its done, I'll still post a pic of it!! Ha.. Next Sat gotta OT again, so i guess that will be the day where all of us complete our Gundam(provided nothing trips on sat).. Stay Tuned!!

No comments: